MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Subject: MACH1 AOI FA8903-27-OT-001 Horizontal Airfield InfrastructureSolicitation Number: FA8903-27-OT-001Notice Type: PRESOLNAICS: 237990Set-Aside: No Set aside usedNotice Published: 11-17-26Response Due: 01-15-27Agency: Department of the Air ForceOffice: FA8903 772 ESS PKContact: 772 ESS/PKA This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: JBSA LACKLAND, TX 78236-9861Place of Performance: San Antonio, TX 78226
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The scope of this AOI encompasses planning, design, engineering, alteration, repair, and physical construction for airfield pavement assets and associated systems. Incidental civil, electrical, mechanical, utility, environmental, and site work directly supporting the primary airfield infrastructure is authorized and included within this scope. All facility types, infrastructure systems, technical specialties, and testing capabilities identified throughout this document are expressly illustrative and non-exhaustive, including but not limited to: Horizontal airfield pavements and operating surfaces, including but not limited to runways, taxiways, aircraft parking aprons, arm/de-arm pads, compass swing bases, holding pads, alert pads, aircraft wash-rack pavements, access roadways, perimeter security paths, and all associated horizontal airfield pavements. Airfield visual and electrical systems, including but not limited to runway edge and centerline lighting, threshold and end lighting, taxiway guidance lighting, approach lighting systems, precision approach path indicators (PAPIs), airfield signage, electrical duct banks, vault infrastructure, counterpoise grounding grids, automated Airfield Lighting Control and Monitoring Systems (ALCMS), mobile aircraft arresting systems (MAAS), and related navigational and visual aids. Civil, drainage, and safety infrastructure, including but not limited to subsurface stormwater drainage networks, detention and retention basins, culverts, erosion and sediment control systems, aircraft arresting system foundations and containment vaults, blast deflectors, airfield perimeter security fencing, and related site-civil infrastructure. Subsurface utility corridors and distribution, including but not limited to utility distribution pathways, aircraft grounding grids, communication ductways, fuel servicing distribution pathways supporting horizontal operations, and associated utility routing. All other civil, geotechnical, electrical, safety, and operational horizontal airfield infrastructure elements necessary to meet mission requirements, regardless of whether specifically itemized above.