Power meter, power sensor, and and multimeter alongside warranty and calibration
Subject: Power meter, power sensor, and and multimeter alongside warranty and calibrationSolicitation Number: PR516494Notice Type: SOLICITNAICS: 334515Notice Published: 11-06-26Response Due: 11-13-26Agency: Department of EnergyOffice: ENERGY, DEPARTMENT OFContact: Haden Wesley This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: Oak Ridge, TN 37831Place of Performance: Oak Ridge, TN 37830
Click for official SAM (FBO) notice, additional information, and accompanying attachments
UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Fusion Energy Division at Oak Ridge National Laboratory is seeking to procure a Keysight system with power meter, power sensor, and and multimeter alongside warranty and calibration or equivalent. Interested offerors should refer to Attachment C - Bill of Materials for detailed specifications. Attachments: - RFP letter - Attachment A - Terms and Conditions Purchase Order Commercial Products and Services BSD-CS-2154 (09/30/26) - Attachment B - Prime Flowdown Clauses (09/30/36) - Attachment C - Bill of Materials and instructions - Attachment D - Reps and Certs Abbreviated (03/09/26)