LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Subject: LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2Solicitation Number: W9128F27BA007Notice Type: SOLICITNAICS: 237990Set-Aside: Total Small BusinessNotice Published: 10-26-26Response Due: 12-03-26Agency: Department of the ArmyOffice: W071 ENDIST OMAHAContact: Grant Hibbs This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: OMAHA, NE 68102-4901Place of Performance: Big Bend, Lower Brule, South Dakota 57548Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.