Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
Subject: Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)Solicitation Number: 36C24626B0041_1Notice Type: SOLICITNAICS: 236220Set-Aside: Service-Disabled Veteran-Owned Small BusinessNotice Published: 10-23-26Response Due: 12-02-26Agency: Department of Veterans AffairsOffice: VETERANS AFFAIRS, DEPARTMENT OFContact: Alice Custis, Contracting Officer This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (757) 722-9961Office Address: HAMPTON, VA 23667Place of Performance: Durham, NC 27705
Click for official SAM (FBO) notice, additional information, and accompanying attachments
Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications. The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control?dual hat. Safety officer must remain separate. Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.