Mobile Home Demolition
Subject: Mobile Home DemolitionSolicitation Number: W911YN-26-Q-A024Notice Type: SOLICITNAICS: 238910Set-Aside: Total Small BusinessNotice Published: 09-09-26Response Due: 09-11-26Agency: Department of the ArmyOffice: W7M2 USPFO ACTIVITY FL ARNGContact: Robert Glanowski This email address is being protected from spambots. You need JavaScript enabled to view it.Office Address: ST AUGUSTINE, FL 32085-1008Place of Performance: Jacksonville, FL 32221Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
***SEE ATTACHED Q&A SET AS OF 09 SEP 2026*** PERFORMANCE WORK STATEMENT Mobile Office Demolition 1.0 Objective The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals. 2.0 Scope of Work This project will be executed in three (3) distinct phases: Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel. Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility. Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition. 3.0 Completion Standard The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear. 4.0 Details Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB) Site POC: CW2 Merrill, Andrew (904) 682-6215 ext. 1150 This email address is being protected from spambots. You need JavaScript enabled to view it. Site Visit Date: 09 September 2026 Time: 10:00 AM Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 POC: Andrew Merrill (CW2) This email address is being protected from spambots. You need JavaScript enabled to view it. (904) 682-6215 ext. 1150 Robert Glanowski (Contract Specialist) This email address is being protected from spambots. You need JavaScript enabled to view it. (904) 823-0555 ***Attendance is not required and will not prohibit quote submissions.***