54--IA-NEAL SMITH NWR-TEMP MODULAR OFFICE
Subject: 54--IA-NEAL SMITH NWR-TEMP MODULAR OFFICESolicitation Number: 140F0S26Q0051Notice Type: SOLICITNAICS: 321991Set-Aside: Total Small BusinessNotice Published: 09-08-26Response Due: 09-11-26Agency: Department of the InteriorOffice: US FISH AND WILDLIFE SERVICEContact: Sung, Robert This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (503) 872-2825Office Address: Falls Church, VA 22041Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
IA - Temp Modular Office Space approx. 36X56 Vendor will submit a packet with drawings and description for the office space that meets the SOW to be offered and a written plan for the installation and set up. Submit a filled out a price sheet, 1st page of the packet. This is a rental contract for temporary office space, not a construction contract. Bonding is not required. See attached packet. For questions and to submit your packet, email This email address is being protected from spambots. You need JavaScript enabled to view it. with "140F0S26Q0051" in the subject line Additional RFI item: Q: The maintenance yard that this modular building is to be located shows a gravel surface. Unless ADA requirements changed this month, that would not be an acceptable surface for a ramp. Asphalt or concrete, or a solid, smooth surface is needed. Is a ramp needed as I?m not seeing anything that indicates a handicap parking area is needed for the ramp to terminate? A: ADA and ABA require level and slip-resistant landings that are free of obstructions. Compacted gravel meets this requirement. Provide accessible ramps per the scope of work. Q: Is low voltage wiring required for phone/data? A: Yes Q: Will office furniture be needed? A: No. Q: When is the expected move in date acceptance of the office space 11/30/26. Contract will start on 11/30/26, but can be adjusted as needed. Temporary office space is expected to be fully set (utilities) up on date the contract starts. NOTE: Vendor is no longer required to submit mockups, however Floor plans/drawings and a written description is required.