FY26 L6WA18_B2390 Fall Protection
Subject: FY26 L6WA18_B2390 Fall ProtectionSolicitation Number: FA857126Q0084Notice Type: SOLICITNAICS: 333923Set-Aside: No Set aside usedNotice Published: 08-19-26Response Due: 08-26-26Agency: Department of the Air ForceOffice: FA8571 MAINT CONTRACTING AFSC PZIMContact: Curtis Green This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (478) 222-3733Office Address: ROBINS AFB, GA 31098-1672Place of Performance: Warner Robins, GA 31098
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The Contractor shall provide all materials, parts, equipment, engineering, labor, shipping and travel necessary to provide fabrication, installation, and integration of a fall protection/fall arrest system (FAS) for C-130 programmed depot maintenance (PDM) performed in B2390 (See Table 1: Summary of Requirements), plus an option for B91 (See Table 2: Summary of Requirements). The system shall provide fall protection for maintenance operations performed on the C-130 wing, center-wing box, empennage, and horizontal stabilizer. The installed FAS shall accommodate non-stretched and stretched C-130 fuselage variants. The Government prefers one FAS that provides fall protection for both variants. The contractor shall use passive systems, such as guard rails, fall restraint, and fall arrest means in this order of government preference. The system shall not contact any aircraft components. Delivery shall include operation manuals, maintenance manuals, recommended preventive maintenance, drawings, SolidWorks models and training of 402d Aircraft Maintenance Group (AMXG) at Robins Air Force Base (AFB), Georgia... Please see PD in attachments for mor information.