Buckley SFB Chiller Replacement
Subject: Buckley SFB Chiller ReplacementSolicitation Number: BuckleySFBChillerReplacementNotice Type: SRCSGTNAICS: 238220Set-Aside: Total Small BusinessNotice Published: 07-14-26Response Due: 07-22-26Agency: Department of the Air ForceOffice: FA2543 460 CONSContact: Ethan Sullivan This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (720) 847-6446Office Address: BUCKLEY AFB, CO 80011-9572Place of Performance: Aurora, CO 80011
Click for official SAM (FBO) notice, additional information, and accompanying attachments
PLEASE SEE ATTACHMENTS FOR ADDITIONAL INFORMATION REGARDING THIS REQUIREMENT Notice Type: Sources Sought (MARKET RESEARCH PURPOSES ONLY) Title: Secure Facility Chilled Water System Replacement ? Federal Installation, CO NAICS Code: 238220 ? Plumbing, Heating, and Air-Conditioning Contractors Product Service Code (PSC): N041 ? Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment Response Date: 22 July 2026 Description: The Department of the Air Force (DAF), on behalf of the Base Civil Engineer Squadron (CES) at a Federal Installation in Colorado, is conducting market research to identify qualified, experienced, and interested business sources?specifically targeting small and socio-economic businesses (e.g., 8(a), SDVOSB, HUBZone, WOSB)?capable of performing a complete chilled water system replacement in a 24/7 operations facility. Project Objective: The chilled water system serving the facility's server room currently suffers from degraded serviceability, sub-component failures, and frequent downtime. It is operating at half capacity, which risks the loss of critical cooling for 24/7 operations. The selected contractor must provide all tools, equipment, materials, and certified labor to perform a complete system replacement with zero downtime to the active server room. Key Scope Items & Technical Specifications: Design & Sizing: Perform professional engineering cooling system design load calculations in accordance with UFC 3-410-01 (Sections 2-4 and 2-5.6) to determine final system capacity. Standardization Requirement: In accordance with the DAF Class Justification and Approval (J&A) for HVAC Chiller Replacement Standardization, the design of the new chiller system must be standardized on Trane-series equipment for this installation. Demolition: Safely decommission, recover refrigerant from, and remove the existing degraded chiller (Technical Systems Model: 30A0LM20-PT, Serial: 02-17-125822-001-001) and two existing Computer Room Air Handlers (CRAHs) (Data Aire Model: GFCU-04634, Serials: 2016-3226-A, 20163225-A). Equipment Installation: Procure, install, and commission: One (1) new water chiller with an integrated air-cooled condenser (Trane-series). Two (2) new chilled-water Computer Room Air Handlers (CRAHs) inside the secure server room. Temporary Cooling: Provide continuous, redundant temporary cooling to keep the secure server room strictly within operational temperature limits during the transition phase. Controls Integration: Fully integrate new controls into the base-wide Energy Management Control System (EMCS) in strict compliance with Base EMCS Standards (dated January 21, 2026) and UFC 3-410-02. Logistical & Physical Constraints: Chiller Pad Limits: The new chiller must fit the existing concrete pad (19? - 11? L x 12?- 8? W x 6? to 8? H) and must not exceed the structural wet weight limit of 12,000 lbs. If the equipment footprint exceeds these limits, the pad must be extended. Rigging & Delivery Clearances: CRAHs must be navigated through a restricted interior corridor with doorway clearances measuring exactly 34? W x 82? H. Electrical: Must integrate with the existing 460V, 60 Hz, 3-Phase power supply and comply with UFC 3-501-01. Security & Clearances: All personnel must pass NCIC background checks, comply with strict OPSEC guidelines, and complete AT Level I training prior to facility access.