Transition Power Supply Installation IDIQ with the Radar Operations Center
Subject: Transition Power Supply Installation IDIQ with the Radar Operations CenterSolicitation Number: 1305M226Q0038Notice Type: SOLICITNAICS: 335999Set-Aside: Total Small BusinessNotice Published: 07-06-26Response Due: 07-14-26Agency: Department of CommerceOffice: NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATIONContact: Taylor Wisneski This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (816) 426-2115Office Address: NORFOLK, VA 23510Place of Performance: Norman, OK Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The Government is seeking a 5-year IDIQ for the following: Eaton 93PM UPS and maintenance bypass module (MBM) and Battery cabinet with batteries installed at sites specified in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). Eaton 93PM UPS and MBM sidecar and Battery cabinet with batteries installed at the sites prescribed in Table 3 of the SON (any associated installation travel costs must be built in to the per unit pricing). and; Eaton 93PM UPS and sidecar w/MBM and Battery cabinet WITHOUT batteries; shipped to the National Logistics Support Center. (NO INSTALLATION) Vendors are responsible for providing all information and documentation listed in Section L- Instructions, Conditions, and Notices to Bidders of attachment Sol_1305M226Q0038, including Volume I: Technical Compliance, Volume II: Installation Plan, Volume Ill: Past Performance, and Volume 4: Price. Evaluation information for those volumnes are provided in Section M - Evaluation Factors for Award. Failure to provide ALL required documents on time will result in submissions being deemed non responsive. Amendment 1: posted 7/1/26; includes questions submited during the inquiries period with their respective answers. Additionally, an Excel document is attached that is referenced in the Q&A document. Amendment 2: posted 7/6/26; no additional documents are included. This amendment only extends the response due date one week to 7/14/26 1:00pm ET.