BOWLING CENTER AND F&B UPGRADES


Subject: BOWLING CENTER AND F&B UPGRADES
Solicitation Number: NAVMWR-26-R-0038
Notice Type: SOLICIT
NAICS: 236220
Set-Aside: No Set aside used
Notice Published: 06-01-26
Response Due: 06-16-26

Agency: Department of the Navy
Office: COMMANDER NAVY INSTALLATIONS CMD
Contact: Nika Maldonado, Contracting Officer This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (901) 930-7728
Office Address: MILLINGTON, TN 38055-6500
Place of Performance: El Centro, CA

Related Notices:
        06-11-26 SOLICIT

        06-16-26 SOLICIT

        06-01-26 SOLICIT

        05-15-26 SOLICIT

        06-23-26 SOLICIT

        05-07-26 SOLICIT


Click for official SAM (FBO) notice, additional information, and accompanying attachments

The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility ?pot holing?) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer?s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP.