FY26 G3 Aviation Solar Generator
Subject: FY26 G3 Aviation Solar GeneratorSolicitation Number: W9124B26QA004Notice Type: SOLICITNAICS: 532490Set-Aside: Total Small BusinessNotice Published: 03-27-26Response Due: 04-13-26Agency: Department of the ArmyOffice: W6QM MICC-FT IRWINContact: Franklin Brown This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (760) 380-4450Office Address: FORT IRWIN, CA 92310-5095Place of Performance: Bicycle Lake Army Airfield (BLAAF), Building 6212 92310Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
The National Training Center (NTC) requires a comprehensive leasing service for one commercial, portable solar generator to support sustained, critical operational requirements at Bicycle Lake Army Airfield (BLAAF), a remote, off-grid location at Fort Irwin. The service is not for a product purchase but for a turn-key power solution, ensuring a reliable, stand-alone power source for a 12-month period. This requirement is driven by the need for uninterrupted mission readiness in an environment lacking permanent power infrastructure.The generator lease must meet specific performance and durability requirements essential for success in the Mojave Desert. The leased unit must deliver a minimum continuous power output of 10kW and include an integrated propane-fueled secondary power source to guarantee 100% operational continuity. This redundancy is critical during periods of low solar generation, overnight missions, or any primary system failure. Furthermore, the equipment must be environmentally hardened and proven capable of long-term performance despite exposure to extreme heat, abrasive sand, and high winds. The contractor bears full responsibility for all maintenance, servicing, and repairs to ensure maximum uptime throughout the lease period. Without this reliable power source, critical operations at BLAAF would be jeopardized.The service is required for a 12-month period of performance, from 16 June 2026 to 15 June 2027. The contractor will be responsible for the timely delivery, installation, and subsequent removal of the generator from Fort Irwin, California. No unique environmental or storage requirements are levied on the government; all such considerations are the responsibility of the contractor.