109 AW - Bldg 20 Sewer Pipe Repair
Subject: 109 AW - Bldg 20 Sewer Pipe RepairSolicitation Number: W50S8J26QA011Notice Type: SOLICITNAICS: 237110Set-Aside: Total Small BusinessNotice Published: 03-24-26Response Due: 03-26-26Agency: Department of the ArmyOffice: W7NR USPFO ACTIVITY NYANG 109Contact: Joshua King This email address is being protected from spambots. You need JavaScript enabled to view it. Ph: (518) 344-2511Office Address: SCOTIA, NY 12302-9572Place of Performance: Schenectady, NY 12302Related Notices:
Click for official SAM (FBO) notice, additional information, and accompanying attachments
Project Title: Bldg. 20 Sewer Pipe Repair Project Location: Stratton Air National Guard Base, Scotia, NY Project Number: VBDZ262101. Reference attached statement of work (SOW) for project details. This is a total small business set-aside for NAICS 237110, water and sewer line and related structures construction with a small business size standard of $45M. The magnitude of this project is less than $25,000. Reference 52.212-2 Evaluation-Commercial Products and Commercial Services. (Deviation) for the quote evaluation factors. Quotes shall be submitted via email to the following address: This email address is being protected from spambots. You need JavaScript enabled to view it.. mil A site visit will be held on March 19, 2026, at 10:00 am. All attendees will meet at the civil engineering building (bldg. 25), 1 Air National Guard Road, Scotia, NY 12302. Interested parties should email This email address is being protected from spambots. You need JavaScript enabled to view it. confirming their intent to attend the site visit. In addition to a valid, government issue photo id, attendees should be prepared to present the following information upon arrival at the gate: Vehicle registration, Real ID compliant id (see https://www.tsa.gov/travel/security-screening/identification) for acceptable forms of id, Proof of vehicle insurance, Safety inspection and car rental agreement if applicable Q&A from 24 March 2026: 1. How deep is the sewer line? Answer: Between 6-7 feet based off our locator 2. What size and material is it made of? Answer: 6” SDR. 3. What kind of flow should we figure for? Answer: 2 buildings run through it, but we will coordinate with the facilities on the day of maintenance and try to schedule an alternate work schedule day to reduce use. 4. Are OSHA 10hr required? Answer: No, we do not require OSHA 10hr.