UNCLASSIFIED
PE 0605049A: Missile Warning System Modernization (MW...
UNCLASSIFIED
Army Page 1 of 6 R-1 Line #165
Exhibit R-2, RDT&E Budget Item Justification: PB2021Army
Date: February 2020
Appropriation/Budget Activity
2040: Research, Development, Test & Evaluation, Army / BA 5: System
Development & Demonstration (SDD)
R-1 Program Element (Number/Name)
PE 0605049A / Missile Warning System Modernization (MWSM)
COST ($ in Millions)
Prior
Years FY 2019 FY 2020
FY 2021
Base
FY 2021
OCO
FY 2021
Total FY 2022 FY 2023 FY 2024 FY 2025
Cost To
Complete
Total
Cost
Total Program Element
- 7.321 1.539 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 8.860
XT4: Advanced Threat Detection
System (ATDS)
- 7.321 1.539 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 8.860
A. Mission Description and Budget Item Justification
The Missile Warning System Modernization (MWSM) budget line includes funding to support the development and integration of Aircraft Survivability Equipment (ASE)
products onto Future Vertical Lift (FVL) Future Attack Reconnaissance Aircraft (FARA) and Future Long Range Assault Aircraft (FLRAA) aircraft variants and future
platforms.
ATDS will provide enhanced missile warning capabilities for current and future Army rotary-wing, small fixed wing, tilt-rotor platforms, and Special Operations rotary wing
aircraft. Primary capability achieved through ATDS is the agility necessary to rapidly react to evolving threats.
B. Program Change Summary ($ in Millions)
FY 2019 FY 2020 FY 2021 Base FY 2021 OCO FY 2021 Total
Previous President's Budget 8.266 1.539 1.551 - 1.551
Current President's Budget 7.321 1.539 0.000 - 0.000
Total Adjustments -0.945 0.000 -1.551 - -1.551
• Congressional General Reductions - -
• Congressional Directed Reductions - -
• Congressional Rescissions - -
• Congressional Adds - -
• Congressional Directed Transfers - -
• Reprogrammings -0.945 -
• SBIR/STTR Transfer - -
• Adjustments to Budget Years - - -1.551 - -1.551
Change Summary Explanation
FY 2021 funding was decreased in response to rescission of the Materiel Development Decision (MDD) Request Memo on December 17, 2018. Prior to the
rescission, the Army Acquisition Executive (AAE) was briefed October 22, 2018. Determination was the Army has shifted focus to Future Vertical Lift (FVL) in
the Aviation arena. ATDS capability no longer aligns with the current focus and will not be pursued at this time. Remaining prior year funding supports enhanced
market research and future missile warning system studies to assess existing and/or proposed technologies available for future development.
337