Submitted to Congress
February 2020
DD
Form
1 Dec 76
Page No. 171
1390
Scope
81310
Cost
($000)
Start
Pier 5 (Berths 2 and 3) (INC)
Complete
0 LS
Design Status
09/2016
8. Projects Requested In This Program
08/2019
A. TOTAL ACREAGE ..(3059 Acres)
4. Command
Cat
Code Project Title
B. INVENTORY AS OF
C. AUTHORIZATION NOT YET IN INVENTORY ......................
D. AUTHORIZATION REQUESTED IN THIS PROGRAM .................
E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM .............
F. PLANNED IN NEXT THREE PROGRAM YEARS .....................
G. REMAINING DEFICIENCY ....................................
H. GRAND TOTAL .............................................
............................30 SEP 2019 14,267,160
13,846
0
0
0
0
C. R&M Unfunded Requirement ($000): 2,520,245
9. Future Projects:
A. Included In The Following Program:
COMFLEACT YOKOSUKA JA
YOKOSUKA, JAPAN
3. Installation and Location:
N61054
B. Major Planned Next Three Years:
FY 2021 MILITARY CONSTRUCTION PROGRAM
0
10. Mission or Major Functions:
11. Outstanding Pollution and Safety Deficiencies ($000):
A. Pollution Abatement(*):
B. Occupational Safety and Health(OSH)(#):
Maintains and operates base facilities for the logistic, recreational,
administrative support and service of the U.S. Naval Forces Japan, U.S.
SEVENTH Fleet and other operating forces forward-deployed in the Western
Pacific.
14,281,006
1. Component
NAVY
2. Date
FEB 2020
2.01
5. Area Const
Cost Index
0
7. INVENTORY DATA ($000)
TOTAL
6. Personnel
Strength:
STUDENTS SUPPORT
OFF ENL CIV OFF ENL CIV OFF ENL CIV
PERMANENT
16989
10822
1140
1217
A. As Of 09-30-19
8185
8964
6683
191
0
0
0
0
0
0
131
119
850
331
0
0
Commander Navy
Installations Command
Submitted to Congress
February 2020
DD
Form
1 Dec 76
Page No. 172
1390
4. Command
COMFLEACT YOKOSUKA JA
YOKOSUKA, JAPAN
3. Installation and Location:
N61054
FY 2021 MILITARY CONSTRUCTION PROGRAM
1. Component
NAVY
2. Date
FEB 2020
2.01
5. Area Const
Cost Index
Commander Navy
Installations Command
Blank Page
Submitted to Congress
February 2020
DD
Form
1 Dec 76
Page No. 173
1391
10. Description of Proposed Construction:
9. COST ESTIMATES
Item UM Quantity Unit Cost Cost($000)
PIER 5 (BERTHS 2 AND 3) (INC)
FIXED SINGLE DECK PIER CC15120
(77,629SF)
DREDGING CC15120 (27,719CY)
CYBERSECURITY FEATURES
BUILT-IN EQUIPMENT
SPECIAL COSTS
OPERATION & MAINTENANCE SUPP
INFO (OMSI)
SUPPORTING FACILITIES
SPECIAL CONSTRUCTION FEATURES
SITE PREPARATIONS
SPECIAL FOUNDATION FEATURES
PAVING AND SITE IMPROVEMENTS
ANTI-TERRORISM/FORCE
PROTECTION
ELECTRICAL UTILITIES
MECHANICAL UTILITIES
DEMOLITION
SUBTOTAL
CONTINGENCY (5%)
TOTAL CONTRACT COST
SIOH (6.2%)
SUBTOTAL
TOTAL REQUEST ROUNDED
TOTAL REQUEST
EQUIPMENT FROM OTHER
APPROPRIATIONS (NON ADD)
LS
m2
m3
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
7,212
21,193
15,277.79
1,387.75
144,660
(110,180)
(29,410)
(250)
(100)
(3,600)
(1,120)
12,000
(120)
(280)
(8,290)
(420)
(350)
(1,560)
(440)
(540)
156,660
7,830
164,490
10,200
174,690
174,690
174,690
(2,630)
MILITARY CONSTRUCTION PROGRAM
2. Date
4. Project Title
5. Program Element
6. Category Code
7. Project Number
1. Component
8. Project Cost ($000)
FEB 2020
74,692
0702776N 15120
Pier 5 (Berths 2 and 3) (INC)
NAVY
2021
FY
P030A
COMFLEACT YOKOSUKA JA
YOKOSUKA, JAPAN
3. Installation(SA)& Location/UIC:
N61054
Constructs a concrete fixed single deck pier to replace the existing
floating pier. The pier includes concrete deck and utility trench, pile
foundations, fender system, mooring hardware, deck ramp and utility support
crossing, mechanical utility piping, electrical distribution system,
lighting, transformer substations, power mounds, communication distribution
system and communications risers.
Submitted to Congress
February 2020
DD
Form
1 Dec 76
Page No. 174
1391C
PROJECT:
MILITARY CONSTRUCTION PROGRAM
2. Date
4. Project Title
5. Program Element
6. Category Code
7. Project Number
1. Component
8. Project Cost ($000)
FEB 2020
74,692
0702776N 15120
Pier 5 (Berths 2 and 3) (INC)
NAVY
2021
FY
P030A
COMFLEACT YOKOSUKA JA
YOKOSUKA, JAPAN
3. Installation(SA)& Location/UIC:
N61054
11. Requirement:
Adequate: Substandard:
This project will provide dredging to allow berthing of the design vessels.
Facility-related control systems include cybersecurity features in
accordance with current Department of Defense (DoD) criteria.
This project will provide Anti-Terrorism/Force Protection (AT/FP) features
and comply with AT/FP regulations and physical security mitigation in
accordance with DoD Minimum Anti-Terrorism Standards for Buildings.
Special costs include Post Construction Award Service (PCAS) and
cybersecurity commissioning. The cybersecurity commissioning cost is to
cover the contractor's submittals, administrative actions, and compliance
with Department of the Navy's (DON) cybersecurity requirements as well as
DON in-house costs to review contractor submittals and to implement steps
necessary for obtaining Authority to Operate.
Operations and Maintenance Support Information (OMSI) is included in this
project.
DoD and DON principles for high performance and sustainable building
requirements will be included in the design and construction of the project
in accordance with federal laws and Executive Orders. Low Impact
Development (LID) will be included in the design and construction of this
project as appropriate.
Special foundation features include access ramp support structure with
pilings and deep soil grout mixing to stabilize the existing seawall.
Electrical utilities work includes the primary electrical distribution
system, exterior lighting, and telecommunication distribution system.
The project demolishes existing Pier 5 (Facility #813, 2,975.78 M2) to
provide space for the new construction.
Facilities will be designed to meet or exceed the useful service life
specified in DoD Unified Facility Criteria. Facilities will incorporate
features that provide the lowest practical life cycle cost solutions
satisfying the facility requirements with the goal of maximizing energy
efficiency.
Submitted to Congress
February 2020
DD
Form
1 Dec 76
Page No. 175
1391C
(F) Type of design contract Design Bid Build
(G) Parametric Estimate used to develop cost
(H) Energy Study/Life Cycle Analysis performed
Yes
Yes
September 2018
January 2019
12. Supplemental Data:
Pier 5 is a floating steel pier constructed in 1940. The service life of
the pier has been exceeded. The moorings have moved causing the pier to
rotate and list. Structural deterioration inside the floating steel
structure prevents ship repair activity at these berths, prohibits crane
operations, and limits vehicle loading on the pier to under 5 tons.
This project is not sited in a 100-year floodplain.
Failure to replace the existing floating steel pier will result in
decreased ship maintenance capability for assigned ships. Frequent berth
shifting of CRUDES vessels will continue to be required to enable crane
support to ships. Berths 2 and 3 will not be capable for use as a storm
mooring location. The pier has exceeded its useful service life and
continued deterioration will result in further restrictions on operations.
A pier is required to support cruiser-destroyer (CRUDES) type ships berthed
on either side, to include nesting one ship outboard of the ship tied to
Berth 3 for a total of three CRUDES ships berthed at the pier receiving
hotel services via utility systems. The pier is required to provide 480V
electrical service at each berth and 4160V electrical service at Berth 3 to
accommodate current and future ship classes.
IMPACT IF NOT PROVIDED:
CURRENT SITUATION:
REQUIREMENT:
Constructs a fixed single deck pier to replace the existing floating pier.
(Current Mission)
MILITARY CONSTRUCTION PROGRAM
2. Date
4. Project Title
5. Program Element
6. Category Code
7. Project Number
1. Component
8. Project Cost ($000)
FEB 2020
74,692
0702776N 15120
Pier 5 (Berths 2 and 3) (INC)
NAVY
2021
FY
P030A
COMFLEACT YOKOSUKA JA
YOKOSUKA, JAPAN
3. Installation(SA)& Location/UIC:
N61054
(D) Percent completed as of
(C) Date design completed
(B) Date 35% Design or Parametric Cost Estimate complete
2. Basis:
(A) Standard or Definitive Design
(B) Where design was previously used
A. Estimated Design Data:
1. Status:
(A) Date design or Parametric Cost Estimate started
No
09/2016
11/2017
08/2019
30%
60%
$10,352
$5,176
(E) Percent completed as of
3. Total Cost (C) = (A) + (B) = (D) + (E):
(A) Production of plans and specifications
(B) All other design costs
Submitted to Congress
February 2020
DD
Form
1 Dec 76
Page No. 176
1391C
MILITARY CONSTRUCTION PROGRAM
2. Date
4. Project Title
5. Program Element
6. Category Code
7. Project Number
1. Component
8. Project Cost ($000)
FEB 2020
74,692
0702776N 15120
Pier 5 (Berths 2 and 3) (INC)
NAVY
2021
FY
P030A
COMFLEACT YOKOSUKA JA
YOKOSUKA, JAPAN
3. Installation(SA)& Location/UIC:
N61054
COLLATERAL EQUIPMENT
ELECTRONIC SECURITY SYSTEM
SMART GRID EQUIPMENT
OMN
OMN
OMN
2022
2022
2022
2,525
75
30
B. Equipment associated with this project which will be provided from
other appropriations:
Equipment
Nomenclature
JOINT USE CERTIFICATION:
The Regional Commander certifies that this project has been considered for
joint use potential. Unilateral Construction is recommended. This
Facility can be used by other components on an as available basis; however,
the scope of the project is based on Department of the Navy requirements.
NAVFAC HQ MILCON Program
Manager
202-685-9401Activity POC: Phone No:
(C) Total
(D) Contract
(E) In-house
5. Construction start:
4. Contract award:
6. Construction complete:
$15,528
$12,509
$3,019
04/2020
03/2020
07/2022
Procuring
Approp
FY Approp
or Requested Cost ($000)
Authorization and Appropriation Summary
Authorization Auth of Approp Approp
($000) ($000) ($000)
FY 2020 Enacted 174,692 100,000 100,000
FY 2021 Request 0 74,692 74,692
Total 174,692 174,692 174,692