11. Requirement:
Adequate: Substandard:
This project will provide dredging to allow berthing of the design vessels.
Facility-related control systems include cybersecurity features in
accordance with current Department of Defense (DoD) criteria.
This project will provide Anti-Terrorism/Force Protection (AT/FP) features
and comply with AT/FP regulations and physical security mitigation in
accordance with DoD Minimum Anti-Terrorism Standards for Buildings.
Special costs include Post Construction Award Service (PCAS) and
cybersecurity commissioning. The cybersecurity commissioning cost is to
cover the contractor's submittals, administrative actions, and compliance
with Department of the Navy's (DON) cybersecurity requirements as well as
DON in-house costs to review contractor submittals and to implement steps
necessary for obtaining Authority to Operate.
Operations and Maintenance Support Information (OMSI) is included in this
project.
DoD and DON principles for high performance and sustainable building
requirements will be included in the design and construction of the project
in accordance with federal laws and Executive Orders. Low Impact
Development (LID) will be included in the design and construction of this
project as appropriate.
Special foundation features include access ramp support structure with
pilings and deep soil grout mixing to stabilize the existing seawall.
Electrical utilities work includes the primary electrical distribution
system, exterior lighting, and telecommunication distribution system.
The project demolishes existing Pier 5 (Facility #813, 2,975.78 M2) to
provide space for the new construction.
Facilities will be designed to meet or exceed the useful service life
specified in DoD Unified Facility Criteria. Facilities will incorporate
features that provide the lowest practical life cycle cost solutions
satisfying the facility requirements with the goal of maximizing energy
efficiency.