5. FREQUENCY AND TYPE OF UTILIZATION
Reservist - 0 weekends/month 2 nights/week
Full-Time Personnel - 5 days/week
6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS
ARNG Starke, FL 30.00 miles Camp Blanding Joint
ARNG Gainesville, FL 3.00 miles ARNG Training Center
USAR Gainesville, FL 2.00 miles USAR Training Center
7. PROJECTS REQUESTED IN THIS PROGRAM
CATEGORY COST DESIGN STATUS
CODE PROJECT TITLE SCOPE ($000) START CMPL
21418 ECS TEMF/Warehouse 7,120 m2 (76,636 SF) 36,000 MAY 2019 AUG 2020
8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION
FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES
FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE
UNILATERAL CONSTRUCTION.
12 FEB 2019
(Date)
9. LAND ACQUISITION REQUIRED
Nominal Land Lease 100.00
(Number of acres)
10. PROJECTS PLANNED IN NEXT FOUR YEARS
CATEGORY COST
CODE PROJECT TITLE SCOPE ($000)
NONE
DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0
11. PERSONNEL STRENGTH AS OF 02 OCT 2019
PERMANENT GUARD/RESERVE
TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED
AUTHORIZED 68 0 0 68 0 0 0
ACTUAL 68 0 0 68 0 0 0
12. RESERVE UNIT DATA AUTHORIZED
STRENGTH
UNIT DESIGNATION AUTHORIZED ACTUAL
ECS 151 68 68
Totals 68 68
13. MAJOR EQUIPMENT AND AIRCRAFT
TYPE AUTHORIZED ACTUAL
AGGREGATE 1,596 1,596
TOTALS 1,596 1,596
14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES
($000)
A. AIR POLLUTION 0
B. WATER POLLUTION 0
C. OCCUPATIONAL SAFETY AND HEALTH 0
1. COMPONENT
AR
FY 2021 GUARD AND RESERVE
MILITARY CONSTRUCTION
2. DATE
February 2020
3. INSTALLATION AND LOCATION
Gainesville
Florida
4. AREA CONSTRUCTION
COST INDEX
.84
DD
FORM
MAY 78
1390s1
PREVIOUS EDITION MAY BE USED INTERNALLY
UNTIL EXHAUSTED
PAGE NO. 1
9. COST ESTIMATES
ITEM
UM (M/E) QUANTITY UNIT COST COST($000)
PRIMARY FACILITY 23,118
21410 Modified TEMF, Large - Army, Reg m2 (SF) 4,245 ( 45,694) 3,114 (13,217)
44220 ALT Gen Purp (GP) Warehouse, Hi- m2 (SF) 2,475 ( 26,642) 1,667 (4,125)
44220 ADD Gen Purp (GP) Warehouse, Hi- m2 (SF) 399.48 ( 4,300) 1,066 (426)
85110 Military Equipment Parking m2 (SY) 135,160 ( 161,650) 32.08 (4,336)
00000 Cyber Security Measures LS -- -- (750)
Sustainability/Energy Measures LS -- -- (264)
SUPPORTING FACILITIES 9,319
Electric Service LS -- -- (863)
Water, Sewer, Gas LS -- -- (1,524)
Paving, Walks, Curbs And Gutters LS -- -- (1,112)
Storm Drainage LS -- -- (288)
Site Imp(4,531) Demo( ) LS -- -- (4,531)
Information Systems LS -- -- (295)
Antiterrorism Measures LS -- -- (103)
Other LS -- -- (603)
ESTIMATED CONTRACT COST 32,437
CONTINGENCY (5.00%) 1,622
SUBTOTAL 34,059
SUPV, INSP & OVERHEAD (5.70%) 1,941
TOTAL REQUEST 36,000
TOTAL REQUEST (ROUNDED) 36,000
TOTAL RELATED FURNITURE & EQUIP (4,836)
10. Description of Proposed Construction Construct an Equipment Concentration Site (ECS)
consisting of a 45,694 square feet (SF) Tactical Equipment Maintenance Facility (TEMF),
alteration of a 26,642 SF Organizational Storage Building, addition of a 4,300 SF
Organizational Storage Building, and 161,650 square yard Military Equipment Parking (MEP)
(gravel / concrete) all collocated in the vicinity of Gainesville, Florida. Building
design(s) will comply with Unified Facilities Criteria, UFC 4-171-05, Army Reserve
Facilities. Supporting facilities include land clearing, paving, aprons, fencing, wash
rack/platform(s), bi-level equipment loading ramps, general site improvements, and
utility connections. Accessibility for the disabled will be provided. Anti Terrorism
Force Protection (ATFP) and physical security measures will be incorporated into the
design including maximum standoff distances from roads, parking areas and vehicle
unloading areas. Cyber Security Measures will be incorporated into this project.
Sustainability/Energy measures will be provided. Facilities will be designed to a minimum
life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02)
including energy efficiencies, building envelope and integrated building systems
performance. Air Conditioning (Estimated 397 kWr/113 Tons).
11. REQ: 7,120 m2 ADQT: NONE SUBSTD: NONE
PROJECT: To provide an Equipment Concentration Site (ECS) consisting of a 45,694 SF
Tactical Equipment Maintenance Facility (TEMF), alteration of a 26,642 SF Organizational
Storage Building, addition of a 4,300 SF Organizational Storage Building, and 161,650 SY
of Military Equipment Parking (MEP) (gravel / concrete) in the vicinity of Gainesville,
1. COMPONENT 2. DATE
AR
FY 2021 MILITARY CONSTRUCTION PROJECT DATA
February 2020
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
Gainesville
Florida ECS TEMF / Warehouse
5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000)
0532292A 21410 CAR 21-82197
Auth 36,000
Approp 36,000
PAGE NO. 2 PREVIOUS EDITION IS OBSOLETE DD FORM 1391, JUL 1999
PROJECT: (CONTINUED)
Florida.
REQUIREMENT: To be located in the vicinity of Gainesville, FL in support of Total Army
Training Integration Mission, this project will provide an Equipment Concentration Site
(ECS) consisting of a 45,694 SF Tactical Equipment Maintenance Facility (TEMF),
alteration of a 26,642 SF Organizational Storage Building, addition of a 4,300 SF
Organizational Storage Building, and 161,650 SY of Military Equipment Parking (MEP)
(gravel / concrete) for a new North Central Florida ECS. The ECS TEMF will consist of
standard 32'x 96' drive thru work bays (comprised of 16'x32' work areas per bay), work
bay safety aisle, commo/electronics shop, equipment alcove, tool/parts/storage,
flammable/controlled waste storage, fluid equipment alcove, fluid distribution,battery
room, classroom/break area/library, shop offices, restrooms/lockers, and
mechanical/telecom room. The Hi-Bay GPW consisting of palletized racking systems.
Privately Owned Parking (POV), concrete aprons, access road(s), vehicle wash
rack/platform(s), bi-level equipment loading ramp, Storm Water Management Area, and a
Overhead Bridge Crane(s).
CURRENT SITUATION: Florida has five Area Maintenance Support Activity (AMSA) facilities
but no ECS in the state. The current AMSAs have severely constrained parking, which
limits mission effectiveness. Army Reserve units in the state of Florida rely on ECS
facilities in other States, (Traveling distances over 600 miles) to draw equipment for
training purposes. A North Central Florida ECS / Warehouse in the vicinity of
Gainesville, FL would alleviate overcrowding at other ECS’s in the Southeast region of
the United States such as ECS 17, Fort Polk, LA; ECS 151, Fort Rucker, AL; ECS 43, Fort
Benning, GA and ECS 124, Fort Jackson, SC. Current equipment densities at these four
ECS’s vary from 100-130 percent full. Ideally, by design an ECS should be at 80% density
to allow for Army Reserve variances in unit mission development and OPTEMPO exercises.
IMPACT IF NOT PROVIDED: If this project is not provided units within the state of
Florida will continue to spend valuable training time and limited resources drawing
equipment from ECSs located in other states which in many instances are located hundreds
of miles from home station. This will continue to have a negative impact on training
missions and readiness of units served.
ADDITIONAL: Required assessments have been made for supporting facilities and the
project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This
project has been coordinated with the installation physical security plan, and all
physical security measures are included. All required antiterrorism protection measures
are included. An economic analysis has been prepared and utilized in evaluating this
project. This project is the best method to satisfy the requirement. The Deputy Assistant
Secretary of the Army (Installations, Housing and Partnerships) certifies that this
project has been considered for joint use potential. The facility will be available for
use by other components. A parametric cost estimate based upon project engineering design
was used to develop this budget estimate. Sustainable principles, to include life cycle
cost effective practices, will be integrated into the design, development and
construction of the project and will follow the guidance detailed in the Army Sustainable
Design and Development Policy - complying with applicable laws and executive orders.
12. SUPPLEMENTAL DATA:
A. Estimated Design Data:
(1) Status:
1. COMPONENT 2. DATE
AR
FY 2021 MILITARY CONSTRUCTION PROJECT DATA
February 2020
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
Gainesville
Florida ECS TEMF / Warehouse
5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000)
0532292A 21410 CAR 21-82197
Auth 36,000
Approp 36,000
DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 3
12. SUPPLEMENTAL DATA (CONTINUED..)
A. Estimated Design Data: (CONTINUED..)
(a) Date Design Started ..............................
10 MAY 2019
(b) Percent Complete as of January 2020............... 35
(c) Date 35% Designed.................................
21 DEC 2019
(d) Date Design Complete..............................
14 AUG 2020
(e) Parametric Cost Estimating Used to Develop Costs.. YES
(f) Type of Design Contract: Design-bid-build
(g) An energy study and life cycle cost analysis will be
documented during the final design.
(2) Basis:
(a) Standard or Definitive Design: NO
(3) Total Design Cost (c) = (a)+(b) OR (d)+(e): ($000)
(a) Production of Plans and Specifications............ 1,919
(b) All Other Design Costs............................ 975
(c) Total Design Cost................................. 2,894
(d) Contract.......................................... 2,315
(e) In-house.......................................... 579
(4)
Construction Contract Award............................
MAR 2021
(5)
Construction Start..................................... APR 2021
(6) Construction Completion................................ APR 2023
B. Equipment associated with this project which will be provided from
other appropriations:
Equipment
Nomenclature
Procuring
Appropriation
Fiscal Year
Appropriated
Or Requested
Cost
($000)
Warehouse Racks OMAR 2022 1,639
Furniture OMAR 2022 1,518
Collateral Equipment OMAR 2022 1,301
IDS OPA 2022 20
Info Sys - ISC OPA 2022 228
Info Sys - PROP OMAR 2022 130
Total 4,836
Point of Contact: Army Reserve Program Manager, (703) 806-6780
1. COMPONENT 2. DATE
AR
FY 2021 MILITARY CONSTRUCTION PROJECT DATA
February 2020
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
Gainesville
Florida ECS TEMF / Warehouse
5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000)
0532292A 21410 CAR 21-82197
Auth 36,000
Approp 36,000
PAGE NO. 4 PREVIOUS EDITION IS OBSOLETE DD FORM 1391C, JUL 1999