PE 0604004F: Advanced Engine Development
UNCLASSIFIED
Air Force Page 1 of 6 R-1 Line #45
Exhibit R-2, RDT&E Budget Item Justification: PB2021Air Force
Date: February 2020
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced
Component Development & Prototypes (ACD&P)
R-1 Program Element (Number/Name)
PE 0604004F / Advanced Engine Development
COST ($ in Millions)
Prior
Years FY 2019 FY 2020
FY 2021
Base
FY 2021
OCO
FY 2021
Total FY 2022 FY 2023 FY 2024 FY 2025
Cost To
Complete
Total
Cost
Total Program Element
- 696.099 671.442 636.495 0.000 636.495 111.830 208.687 218.644 0.000 0.000 2,543.197
643608: Advanced Engine Dev
- 696.099 671.442 636.495 0.000 636.495 111.830 208.687 218.644 0.000 0.000 2,543.197
Quantity of RDT&E Articles - - - - - - - - - -
A. Mission Description and Budget Item Justification
The Advanced Engine Development Program enables demonstration of advanced turbine engine prototypes. This program is maturing fuel efficient adaptive engine
component technologies and reducing associated risk in preparation for next-generation propulsion system development for combat aircraft applications. Adaptive
engine technology enables next generation combat aircraft capabilities by combining the efficiency of high bypass turbofans used by commercial airlines with the
performance demanded of military fighter engines. This technology has undergone initial development under the auspices of the Air Force Research Laboratory through
the Adaptive Engine Technology and Adaptive Engine Technology Demonstrator programs.
In addition, this program element may include necessary civilian pay expenses required to manage, execute, and deliver advanced engine capabilities. The use of such
program funds would be in addition to the civilian pay expenses budgeted in program element 0605831F.
This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies,
representative modes or prototype systems in a high fidelity and realistic operating environment.
B. Program Change Summary ($ in Millions)
FY 2019 FY 2020 FY 2021 Base FY 2021 OCO FY 2021 Total
Previous President's Budget 720.355 878.442 637.657 0.000 637.657
Current President's Budget 696.099 671.442 636.495 0.000 636.495
Total Adjustments -24.256 -207.000 -1.162 0.000 -1.162
• Congressional General Reductions 0.000 0.000
• Congressional Directed Reductions 0.000 -207.000
• Congressional Rescissions 0.000 0.000
• Congressional Adds 0.000 0.000
• Congressional Directed Transfers 0.000 0.000
• Reprogrammings 0.000 0.000
• SBIR/STTR Transfer -24.256 0.000
• Other Adjustments 0.000 0.000 -1.162 0.000 -1.162
Change Summary Explanation
Decrease in FY 2020 of $207.000 million is due to a Congressional directed reduction in the Department of Defense Appropriations Act 2020 for funding excess
to need.
Volume 2 - 101
UNCLASSIFIED
PE 0604004F: Advanced Engine Development
UNCLASSIFIED
Air Force Page 2 of 6 R-1 Line #45
Exhibit R-2, RDT&E Budget Item Justification: PB2021Air Force
Date: February 2020
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced
Component Development & Prototypes (ACD&P)
R-1 Program Element (Number/Name)
PE 0604004F / Advanced Engine Development
Decrease in FY 2021 of $1.162 million is due to Department of Defense inflation adjustments.
C. Accomplishments/Planned Programs ($ in Millions)
FY 2019 FY 2020 FY 2021
Title: Adaptive Engine Transition Program
Description: The Adaptive Engine Transition Program (AETP) will design and manufacture multiple flight-weight adaptive engine
prototypes, complete component rig assessments, characterize materials, and inform manufacturing process improvements.
The program will demonstrate adaptive engine technology can be scaled to meet military fighter engine size requirements, while
ensuring appropriate manufacturing and technology readiness levels by producing flight-weight prototypes. The prototype engines
will demonstrate fuel efficiency increases, thrust increases, and new component technologies by performing sea-level, altitude,
and durability assessments across multiple power settings. These assessments will provide data to quantify the capability and
reduce risk in areas such as thermal capacity, reliability, and supportability, among others.
The FY 2021 Budget Justification Exhibit has been updated to reflect the breakout of the FY2019 through FY 2021 Next
Generation Adaptive Engine (NGAP) funds from the AETP effort to increase transparency to Congress. This breakout will be
reflected in future Budget Exhibits.
FY 2020 Plans:
Continue component rig activities. Continue technology, affordability, and sustainability studies. Continue engine fabrication.
Begin engine assessments. Continue additional airframe integration/adaptive propulsion design efforts. More details can be
provided in an appropriate forum.
FY 2021 Plans:
Complete component rig activities. Complete technology, affordability, and sustainability studies. Complete engine fabrication and
assessments. Complete airframe integration/adaptive propulsion design efforts. More details can be provided in an appropriate
forum.
FY 2020 to FY 2021 Increase/Decrease Statement:
FY 2021 decreased compared to FY 2020 by $214.018 million. Funding decreased due to completion of numerous activities
leading up to the final prototype ground-run demonstrations in FY 2021.
589.729 447.449 233.431
Title: Next Generation Adaptive Propulsion
Description: The Next Generation Adaptive Propulsion (NGAP) effort will design and perform component risk reduction
for flight-weight adaptive engine prototypes for next generation fighter applications. NGAP will demonstrate that adaptive
engine technology can be scaled to meet next generation military fighter engine size requirements, while ensuring appropriate
manufacturing and technology readiness levels.
106.370 223.993 403.064
Volume 2 - 102
UNCLASSIFIED
PE 0604004F: Advanced Engine Development
UNCLASSIFIED
Air Force Page 3 of 6 R-1 Line #45
Exhibit R-2, RDT&E Budget Item Justification: PB2021Air Force
Date: February 2020
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced
Component Development & Prototypes (ACD&P)
R-1 Program Element (Number/Name)
PE 0604004F / Advanced Engine Development
C. Accomplishments/Planned Programs ($ in Millions)
FY 2019 FY 2020 FY 2021
The FY 2021 Budget Justification Exhibit has been updated to reflect the breakout of the FY2019 through FY 2021 Next
Generation Adaptive Engine (NGAP) funds from the AETP effort to increase transparency to Congress. This breakout will be
reflected in future Budget Exhibits.
FY 2020 Plans:
Conduct adaptive engine preliminary design activities for next generation fighter applications. More details can be provided in an
appropriate forum.
FY 2021 Plans:
Complete adaptive engine preliminary design activities for next generation fighter applications. More details can be provided in an
appropriate forum.
FY 2020 to FY 2021 Increase/Decrease Statement:
FY 2021 increased compared to FY 2020 by $179.071 million. Funding increased due to continuation of preliminary design
activities leading up to the initiation of prototyping activities in FY 2022.
Accomplishments/Planned Programs Subtotals
696.099 671.442 636.495
D. Other Program Funding Summary ($ in Millions)
N/A
Remarks
E. Acquisition Strategy
For Adaptive Engine Transition Program, the Air Force has awarded two limited source, cost plus incentive fee contracts to General Electric and Pratt & Whitney due to
their unique qualifications to design a high performance, flight-weight adaptive turbine engine in the thrust class for AETP. Incentive categories include engine weight,
performance factors, and maintainability and supportability, with specific metrics for each area incentivized. The government agency responsible for managing this
program is the Air Force Life Cycle Management Center, Propulsion Directorate, Wright-Patterson Air Force Base, Ohio.
Volume 2 - 103
UNCLASSIFIED
PE 0604004F: Advanced Engine Development
UNCLASSIFIED
Air Force Page 4 of 6 R-1 Line #45
Exhibit R-3, RDT&E Project Cost Analysis: PB2021Air Force
Date: February 2020
Appropriation/Budget Activity
3600 / 4
R-1 Program Element (Number/Name)
PE 0604004F / Advanced Engine
Development
Project (Number/Name)
643608 / Advanced Engine Dev
Product Development ($ in Millions)
FY 2019 FY 2020
FY 2021
Base
FY 2021
OCO
FY 2021
Total
Cost Category Item
Contract
Method
& Type
Performing
Activity & Location
Prior
Years Cost
Award
Date Cost
Award
Date Cost
Award
Date Cost
Award
Date Cost
Cost To
Complete
Total
Cost
Target
Value of
Contract
Adaptive Engine Transition
Program - GE
C/CPIF GE : Evendale, OH - 336.645 Oct 2018 189.559 Oct 2019 94.607 Oct 2020 - 94.607 0.000 620.811 -
Adaptive Engine Transition
Program - PW
C/CPIF
PW : East Hartford,
CT
- 251.079 Oct 2018 251.522 Oct 2019 135.194 Oct 2020 - 135.194 0.000 637.795 -
Next Generation Adaptive
Propulsion - GE
C/CPIF GE : Evendale, OH - 52.655 Oct 2018 109.579 Oct 2019 188.267 Oct 2020 - 188.267 Continuing Continuing -
Next Generation Adaptive
Propulsion - PW
C/CPIF
PW : East Hartford,
CT
- 51.710 Oct 2018 111.048 Oct 2019 211.167 Oct 2020 - 211.167 Continuing Continuing -
Subtotal
- 692.089 661.708 629.235 - 629.235 Continuing Continuing N/A
Management Services ($ in Millions)
FY 2019 FY 2020
FY 2021
Base
FY 2021
OCO
FY 2021
Total
Cost Category Item
Contract
Method
& Type
Performing
Activity & Location
Prior
Years Cost
Award
Date Cost
Award
Date Cost
Award
Date Cost
Award
Date Cost
Cost To
Complete
Total
Cost
Target
Value of
Contract
Adaptive Engine Transition
Program - Program
Management Support
Various Various : TBD - 2.005 Dec 2018 6.367 Dec 2019 3.630 Dec 2020 - 3.630 0.000 12.002 -
Next Generation Adaptive
Propulsion - Program
Management Support
Various Various : TBD - 2.005 Dec 2018 3.367 Dec 2019 3.630 Dec 2020 - 3.630 Continuing Continuing -
Subtotal
- 4.010 9.734 7.260 - 7.260 Continuing Continuing N/A
Prior
Years FY 2019 FY 2020
FY 2021
Base
FY 2021
OCO
FY 2021
Total
Cost To
Complete
Total
Cost
Target
Value of
Contract
Project Cost Totals
- 696.099 671.442 636.495 - 636.495 Continuing Continuing N/A
Remarks
The FY 2021 Budget Justification Exhibit has been updated to reflect the breakout of the FY2019 through FY 2021 Next Generation Adaptive Engine (NGAP) funds from the
AETP effort to increase transparency to Congress. This breakout will be reflected in future Budget Exhibits.
Volume 2 - 104
UNCLASSIFIED
PE 0604004F: Advanced Engine Development
UNCLASSIFIED
Air Force Page 5 of 6 R-1 Line #45
Exhibit R-4, RDT&E Schedule Profile: PB2021Air Force
Date: February 2020
Appropriation/Budget Activity
3600 / 4
R-1 Program Element (Number/Name)
PE 0604004F / Advanced Engine
Development
Project (Number/Name)
643608 / Advanced Engine Dev
FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Adaptive Engine Transition Program
Detailed Design, Engine Fabrication, Engine
Assessments
Next Generation Adaptive Propulsion
Preliminary Design
Detailed Design, Engine Fabrication, Engine
Assessments
Volume 2 - 105
UNCLASSIFIED
PE 0604004F: Advanced Engine Development
UNCLASSIFIED
Air Force Page 6 of 6 R-1 Line #45
Exhibit R-4A, RDT&E Schedule Details: PB2021Air Force
Date: February 2020
Appropriation/Budget Activity
3600 / 4
R-1 Program Element (Number/Name)
PE 0604004F / Advanced Engine
Development
Project (Number/Name)
643608 / Advanced Engine Dev
Schedule Details
Start End
Events by Sub Project Quarter Year Quarter Year
Adaptive Engine Transition Program
Detailed Design, Engine Fabrication, Engine Assessments 1 2019 2 2022
Next Generation Adaptive Propulsion
Preliminary Design 1 2019 1 2022
Detailed Design, Engine Fabrication, Engine Assessments 2 2022 2 2025
Note
The FY 2021 Budget Justification Exhibit has been updated to reflect the breakout of the FY2019 through FY 2021 Next Generation Adaptive Engine (NGAP) funds from
the AETP effort to increase transparency to Congress. This breakout will be reflected in future Budget Exhibits.
The Adaptive Engine Transition Program consists of three phases: detailed design, engine fabrication, and engine assessments.
Program deliverables include: military adaptive engine detailed design parameters and models, multiple engine sets of hardware (plus spare parts), matured
technologies, major rig assessment data (controls, combustor, etc.), program reviews, and technology, affordability and sustainability studies.
The Next Generation Adaptive Propulsion effort consists of four phases: Preliminary design, detailed design, engine fabrication, and engine assessments.
Program deliverables include: military adaptive engine detailed design parameters and models, engine hardware (plus spare parts), matured technologies, major rig
assessment data (controls, combustor, etc.), program reviews, and technology, affordability and sustainability studies for next generation fighter aircraft.
Additional details can be provided in the appropriate forum.